INDIAN AFFAIRS: LAWS AND TREATIES

Vol. VI, Laws     (Compiled from February 10, 1939 to January 13, 1971)

Washington : Government Printing Office


Home | Disclaimer & Usage | Table of Contents | Index

PUBLIC LAWS OF THE SEVENTY-SIXTH CONGRESS, THIRD SESSION, 1940-1941.
Chap. 49  | Chap. 51 | Chap. 77 | Chap. 78 | Chap. 79 | Chap. 80 | Chap. 107 | Chap. 158 | Chap. 159 | Chap. 206 | Chap. 276 | Chap. 280 | Chap. 283 | Chap. 285 | Chap. 304 | Chap. 315 | Chap. 318 | Chap. 320 | Chap. 322 | Chap. 355 | Chap. 323 | Chap. 359 | Chap. 395 | Chap. 396 | Chap. 412 | Chap. 413 | Chap. 415 | Chap. 421 | Chap. 432 | Chap. 437 | Chap. 460 | Chap. 496 | Chap. 497 | Chap. 552 | Chap. 554 | Chap. 555 | Chap. 565 | Chap. 629 | Chap. 687 | Chap. 715 | Chap. 761 | Chap. 780 | Chap. 781 | Chap. 785 | Chap. 787 | Chap. 844 | Chap. 845 | Chap. 851 | Chap. 861 | Chap. 876 | Chap. 895 | Chap. 906 | Chap. 921

Page Images




Chapter 861
October 14, 1940 [H. R. 10122] |  [Public, No. 848] 54 Stat. 1119

AN ACT
To amend an Act entitled “An Act authorizing construction of water conservation and utilization projects in the Great Plains and arid and semiarid areas of the United States”, approved August 11, 1939 (53 Stat. 1418), and an Act entitled “An Act to promote conservation in the arid and semiarid areas of the United States by aiding in the development of facilities for water storage and utilization, and for other purposes”, approved August 28, 1937 (50 Stat. 869).
Section 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12

Margin Notes
Chap. 861 Great Plains, etc., water conservation.
Chap. 861 16 U. S. C., Supp. V, §§ 590y-590bb.
Sec. 1 Water conservation and utilization projects.
Sec. 1 Provisos. Federal title to project works.
Sec. 1 Expenditures to meet reimbursable costs, limitation.
Sec. 2 1120
Sec. 2 Utilization of services, etc., of other agencies.
Sec. 2 Use of moneys received.
Sec. 3 Investigations.
Sec. 3 Reports and findings.
Sec. 3 Participation by Department of Agriculture.
Sec. 3 When project deemed authorized.
Sec. 3 Findings.
Sec. 3 Availability of services, property, etc.
Sec. 3 1121
Sec. 3 Contribution by non-Federal agencies.
Sec. 3 Rights-of-way to be secured before construction.
Sec. 3 Acquisition of water rights, etc.
Sec. 4 Repayment contracts.
Sec. 4 "Reimbursable construction costs."
Sec. 4 Proviso. Administrative expenses.
Sec. 4 Provisions of repayment contract.
Sec. 4 Development period.
Sec. 4 Water charges.
Sec. 4 1122
Sec. 4 Federal operation.
Sec. 4 Suspension for non-payment of charges.
Sec. 4 Spread of certain repayments.
Sec. 4 Date of first installment.
Sec. 4 Proviso. Provisions not affected.
Sec. 4 Accounting.
Sec. 4 Delinquencies in payments, penalties.
Sec. 4 Size of farm units of irrigable lands.
Sec. 4 Provisos. Provision not applicable to U.S. Transfer or disposal of land in project area.
Sec. 4 Delivery of water under prior rights.
Sec. 5 Cooperative rehabilitation program.
Sec. 5 1123
Sec. 5 Settlement of projects.
Sec. 5 Guidance to settlers.
Sec. 5 Acquisition of agricultural lands.
Sec. 5 Improvement of lands.
Sec. 5 Contracts between U.S. and water users for lease, etc., of lands.
Sec. 5 Return of costs incurred by U.S.
Sec. 5 Assistance of other agencies; reimbursement.
Sec. 6 Cooperative agreements. Investigations and surveys of proposed projects.
Sec. 6 Provisions to be included.
Sec. 6 Jurisdiction over repayment contracts.
Sec. 6 1124
Sec. 6 Arrearage penalty.
Sec. 6 Combination of contracts.
Sec. 7 16 U. S. C., Supp. V, §§ 590r-590x.
Limitation on expenditures.
Sec. 7 Combination of project facilities.
Sec. 8 Disposition of receipts from project operations.
Sec. 8 Availability of certain funds.
Sec. 9 Furnishing of water supplies, power, etc.
Sec. 9 Provisos. Limitation on expenditure.
Sec. 9 Restriction on contracts.
Sec. 9 Federal title.
Sec. 9 1125
Sec. 9 Rates.
Sec. 9 Duration of contracts.
Sec. 9 Preference in sales or leases.
Sec. 9 49 Stat. 1363.
7 U. S. C., Supp. V, §§ 901-914.
Authority of Secretary to utilize Federal lands.
Sec. 10 48 U. S. C., ch. 12; Supp. V, ch. 12.
Sec. 10 Authority to acquire lands, etc.
Sec. 11 Administrative provisions.
Sec. 12 Appropriations authorized.

Page 98

Be it enacted by the Senate and House of Representatives of the United States of America in Congress assembled, That the Act entitled "An Act authorizing construction of water conservation and utilization projects in the Great Plains and arid and semiarid areas of the United States", approved August 11, 1939 (53 Stat. 1418), is hereby amended to read as follows:

“SEC. 1.

For the purpose of stabilizing water supply and thereby rehabilitating farmers on the land and providing opportunities for permanent settlement of farm families, the Secretary of the Interior

Page 99

(hereinafter referred to as "the Secretary") is hereby authorized to investigate and, upon compliance with the provisions of this Act, to construct water conservation and utilization projects in the Great Plains and arid and semiarid areas of the United States, and to operate and maintain each such project in accordance with the provisions of this Act: Provided, That the United States shall retain title to the dams, reservoirs, irrigation, and other project works until Congress otherwise provides: And provided further, That expenditures from appropriations made directly pursuant to the authority contained in section 12 (1) to meet reimbursable construction costs allocated to irrigation as defined in section 4 (b) shall not exceed $1,000,000 for dams and reservoirs in any one project.

“SEC. 2.

In connection with the investigation, construction, or operation and maintenance of a project, pursuant to the authority of this Act, the Secretary is authorized to utilize (1) in such manner as the President may direct, services, labor, materials, or other property, including money, supplied by the Work Projects Administration, the Civilian Conservation Corps, the Office of Indian Affairs, the Department of Agriculture, or any other Federal agency, for which the United States shall be reimbursed in such amounts as the President may fix for each project, within the limits of the water users' ability to repay costs as found by the Secretary under subsection 3 (a) (iv); and (2) such services, labor, materials, easements or property, including money, as may be contributed by any State or political subdivision thereof, State agency, municipal corporation, or other organization, or individuals, if, in the judgment of the Secretary, the acceptance thereof will not impair the title of the United States to the project works and will not reduce the probability that the project water users can meet the obligations to the United States entered into pursuant to this Act. Moneys received and accepted under (2) of this section shall be and remain available for expenditure for the purposes for which contributed in like manner as if said sums had been specifically appropriated for said purposes.

“SEC. 3.

(a) No construction of a project may be undertaken pursuant to the authority of this Act unless and until the Secretary has made an investigation thereof and has submitted to the President his report and findings on—
"(i) the engineering feasibility of the proposed construction;
"(ii) the estimated cost of the proposed construction;
"(iii) the part of the estimated cost which properly can be allocated to irrigation;
"(iv) the part of the estimated cost which probably can be repaid by the water users in accordance with the requirements of section 4;
"(v) the part of the estimated cost which can properly be allocated to municipal or miscellaneous water supplies or power and probably be returned to the United States in revenues therefrom;
"(vi) the part of the estimated cost which can properly be allocated to the irrigation of Indian trust and tribal lands, and be repayable in accordance with existing law relating to Indian lands;
"(vii) the part of the estimated cost which can properly be allocated to flood control as recommended by the Chief of Engineers, War Department.

In connection with each such investigation, report, and finding, the Secretary shall consult with the Secretary of Agriculture regarding participation in the proposed project by the Department of Agriculture under the authority of sections 5 and 6; and the Secretary shall also transmit to the President a report by the Secretary of Agriculture to the President on the participation, if any, proposed by the Depart-

Page 100

ment of Agriculture. The project shall be deemed authorized and may be undertaken pursuant to this Act if (1) the Secretary finds and certifies to the President that the project has engineering feasibility and that the water users probably can repay, in accordance with the requirements of section 4, an amount equal to or in excess of that part of the estimated cost allocated by him to irrigation to be met by expenditure of moneys appropriated pursuant to section 12 (1); and (2) the President has approved said report and findings and has found that services, labor, materials, easements, and other property, including money, for the construction of the project, should be made available to the Department of the Interior by the Work Projects Administration or other Federal agencies, to the extent found necessary by the Secretary to make up the difference between the estimated cost of project construction and (i) the part thereof to be met by expenditure of moneys appropriated pursuant to section 12(1), together with (ii) such services, materials, money, easements, and other property as non-Federal agencies or parties have agreed to contribute and the Secretary has found acceptable under section 2.

"(b) No actual construction of the physical features of a project, which meets the requirements of subsection (a) shall be undertaken unless and until (1) rights-of-way and other interests in land deemed by the Secretary to be necessary for the construction and operation of the major features of the project works have been secured, with titles or easements and at prices satisfactory to the Secretary; and (2) the Secretary has found (i) that water rights adequate for the purposes of the project have been acquired with titles and at prices satisfactory to him, or have been initiated and can be perfected in conformity with State law and any applicable interstate agreements and in a manner satisfactory to him; and (ii) that such water rights can be utilized for the purposes of the project in conformity with State law and any applicable interstate agreements and in a manner satisfactory to him.

“SEC. 4.

(a) No water for irrigation may be delivered from the works of any project constructed under the authority of this Act until after the repayment contract or contracts required by this section have been executed. Where practicable in the judgment of the Secretary, the repayment contract shall be with a water users' organization or organizations satisfactory in form and powers to the Secretary; and otherwise the repayment contract shall be with the individual landowners. The contract or contracts shall contain such provisions as the Secretary deems necessary to carry out the purposes of this Act and to protect the interests of the United States.

"(b) The term 'reimbursable construction costs' as used in this Act means that part of the costs of investigating, constructing, and operating and maintaining the project, which are allocated by the Secretary to irrigation, and which are met by expenditures of moneys therefor appropriated under the authority of section 12 (1), plus such amounts as the President, under section 2 (1), may determine to be reimbursable; Provided, That administrative expenses incurred in the District of Columbia in connection with the investigation, construction, or operation and maintenance of a project shall not be included in the reimbursable construction costs nor shall they be charged to the water users in any way.

"(c) The repayment contract or contracts for a project shall, in their aggregate, provide for repayment to the United States of the total amount of the reimbursable construction costs of the project allocated to irrigation. Each such contract shall provide, among other things, that—

"(1) The Secretary shall fix a development period for each project of not to exceed ten years from and including the first calendar year in which water is delivered for the lands in said project; and during the development period water shall be delivered to the lands in the project

Page 101

involved at a charge per acre-foot, or other charge, to be fixed by the Secretary each year and to be paid in advance of delivery of water. Such charges shall be fixed with a view of returning such amounts as in the Secretary's judgment are justified by the rate of project development, including as a minimum the return over the full development period of that part of the cost of operating and maintaining the project, during said period, allocated by the Secretary to irrigation; and collections of such charges in excess of the cost of the operation and maintenance during the development period, as thereafter determined by the Secretary, shall be credited to the reimbursable construction costs of the project in the manner determined by the Secretary.

"(2) The United States shall operate and maintain the project during the development period fixed for it. After the development period, the United States shall operate and maintain the project or any part thereof as long as is deemed necessary by the Secretary, and shall be paid in advance for each year that part of the estimated cost of operating and maintaining the project for such year allocated by the Secretary to irrigation. In the event charges due the United States are not paid when due the United States may, at its election, suspend operations in whole or in part.

"(3) The repayment of the reimbursable construction costs, except as to Indian lands which shall be repayable in accordance with existing law relating to Indian lands, shall be spread in not to exceed forty annual installments, of the number and amounts fixed by the Secretary; and the first annual installment under each contract shall become due and payable on the date fixed by the Secretary, in the year next following the last year of the development period fixed under subsection (c) (1): Provided, That the provisions of this subsection shall not be construed to modify the provisions of special legislation pertaining to any particular project.

"(4) The water users or their organization will take such measures as the Secretary deems proper to secure the adoption of proper accounting, to protect the condition of project works, and to provide for the proper use thereof, and to protect project lands against deterioration due to improper use of water. Delinquencies in any payments due to the United States shall be penalized by a penalty of not less than one-half of 1 per centum per month. No water shall be delivered to or for any land or party while either said land or the organization in which it is located or said party is in arrears in the advance payment of operation and maintenance charges or development period charges under subsection (c) (1), or in arrears for more than twelve months in the payment of an installment of the reimbursable construction costs.

"(5) The Secretary shall establish the size of farm units of irrigable lands on each project in accordance with his findings of the area sufficient in size for the support of a family on the lands to be irrigated. No water may be delivered to or for more than the farm unit area of irrigable lands in the project owned by a single landowner: Provided, That this subsection shall not apply to the United States or any agency or instrumentality thereof, corporate or otherwise. No water shall be delivered to or for any land, in a project area, transferred or disposed of subsequent to approval of the project by the President, and within three years from the time water becomes available, unless and until it has been shown to the satisfaction of the Secretary or his duly authorized representative that the land has been transferred or disposed of at a price not exceeding the appraised value as determined by the Secretary or his duty authorized representatives, and upon proof of fraudulent representation as to the true consideration involved the Secretary is authorized to cancel the water right attaching to the land involved: Provided further, That nothing

Page 102

herein shall be construed to create authority to interfere with the delivery of water under prior rights.

“SEC. 5.

(a) In connection with the construction or operation and maintenance of projects undertaken pursuant to the authority of this Act, and in order to further in the Great Plains and arid and semiarid areas of the United States an effective rehabilitation program, stabilization of the agricultural economy and maximum utilization of funds spent for relief purposes, the Secretary of Agriculture is hereby authorized, pursuant to cooperative agreement with the Secretary of the Interior, (1) to arrange for the settlement of the projects on a sound agricultural basis, and insofar as practicable, the location thereon of persons in need; (2) to extend guidance and advice to settlers thereon in matters of farm practice, soil conservation, and efficient land use; (3) to acquire agricultural lands within the boundaries of such projects, with titles and at prices satisfactory to him; and (4) to arrange for the improvement of lands within the project boundaries, including clearing, leveling, and preparing them for distribution of irrigation water. Contracts between the United States and water users or water users' organizations for the lease or purchase of, or the improvement of, lands within such projects shall provide for annual or semiannual payments to the United States, of the number and amounts fixed by the Secretary of Agriculture. The lease, purchase, or improvement contracts for each tract of land shall provide in the aggregate for the return, in not to exceed fifty years from the date the land is first settled upon, of the costs incurred by the United States in acquiring and improving such tract of land with funds appropriated under authority of section 12 (2), except administrative expenses incurred in the District of Columbia, together with interest on unpaid balances of said costs at not less than 3 per centum per annum. Such lease, purchase, or improvement contracts shall also provide for the fulfillment of such obligations related to reimbursable construction costs and operation and maintenance charges as may be applicable to such lands in accordance with the repayment contract or contracts required by section 4.

"(b) For the purposes of this section, the Secretary of Agriculture may utilize (1) in such manner as the President may direct, services, labor, materials, or other property, including money, supplied by the Work Projects Administration, the Civilian Conservation Corps, the Office of Indian Affairs, the Department of Agriculture, or any other Federal agency to the extent that the President, upon the report and recommendations of the Secretary of Agriculture, finds that the same should be supplied in assistance of such improvement work, and for which the United States shall be reimbursed in such amounts as the President may fix for each project; and (2) such services, labor, materials, easements, or other property, including money, as may be contributed by any State or political subdivision thereof, State agency, municipal corporation, or other organization, or individuals. Moneys received and accepted under (2) of this subsection shall remain available for expenditure for the purposes for which contributed in like manner as if said sums had been specifically appropriated for said purposes.

“SEC. 6.

The Secretary, by cooperative agreements, may arrange with the Department of Agriculture or with such other Federal or State agencies, as the President may deem desirable, for cooperation in the investigations and surveys of projects proposed under the authority of this Act; and in connection with any such project which is undertaken the Secretary by such cooperative agreements may arrange for such cooperation in the construction or operation and maintenance of the project as he deems desirable. Any such cooperative agreement with the Department of Agriculture may provide, among other things (1) that the Secretary of Agriculture shall enter

Page 103

into the repayment contracts, required by section 4, and shall handle the collections of repayments and shall take over the other administrative duties connected with the project, after the Secretary of the Interior announces that the project is ready for operation; (2) if such agreement be entered into after construction of the project has been undertaken by the Secretary of the Interior and after he has entered into the repayment contracts required by section 4, that the Secretary of Agriculture shall take over the collection of repayments and other administrative duties connected with the project; (3) that no water shall be delivered to or for any land or party while the owner of said land or said party is in arrears for more than twelve months in the payment to the United States of money due and payable under a land contract entered into pursuant to section 5 (a); and (4) that any repayment contract with a water user or water users' organization entered into pursuant to section 4 and any land contract with the same water user or organization entered into pursuant to section 5 (a), if said contracts involve the same land, may be combined in a single instrument. The Secretary of Agriculture is hereby authorized to carry out the provision of any such cooperative agreements.

“SEC. 7.

On any one project undertaken pursuant to the Act of August 28, 1937, entitled "An Act to promote conservation in the arid and semiarid areas of the United States by aiding in the development of facilities for water storage and utilization, and for other purposes" (50 Stat. 869), as amended and supplemented, expenditures for the construction, maintenance, operation, rehabilitation or financial assistance of any one project, shall not exceed $50,000 of Federal funds, whether appropriated or allotted or both. All project facilities and appurtenances which depend for their utility in whole or in part upon each other or upon any common facility shall be deemed one project within the meaning of this section.

“SEC. 8.

All payments made to the United States under repayment contracts on account of reimbursable construction costs, including penalties collected for delinquencies in such payments, and all other receipts from project operations pursuant to sections 4 and 9 shall be covered into the Treasury to the credit of miscellaneous receipts. Charges collected during the development period of a project under section 4 (c) (1), excepting such amounts thereof as may be credited to reimbursable construction costs, and charges collected for the operation and maintenance of a project under section 4 (c) (2) shall be available for expenditure for operation and maintenance of said project in like manner as if said funds had been specifically appropriated for said purposes.

“SEC. 9.

In connection with any project undertaken pursuant to this Act, provisions, including contracts of sale, may be made for furnishing municipal or miscellaneous water supplies, or for developing and furnishing power in addition to the power requirements of irrigation: Provided, That expenditures from appropriations made directly pursuant to the authority contained in section 12 (1) to meet costs allocated to municipal or miscellaneous water supplies or surplus power shall not exceed $500,000 for any one project: Provided further, That no contract relating to a water supply for municipal or miscellaneous purposes or to electric power shall be made unless, in the judgment of the Secretary, it will not impair the efficiency of the project for irrigation purposes. On any project where such provisions are made, the Secretary shall allocate to municipal or miscellaneous water purposes or to surplus power the part of the estimated construction costs of the project which he deems properly so allocable; and such allocations shall not be included in the reimbursable construction costs covered by the repayment contract or contracts required under section 4. All right, title, and interest in the facilities provided for such municipal or miscellaneous water supplies or surplus power and

Page 104

the revenues derived therefrom shall be and remain in the United States. Contracts for such municipal or miscellaneous water supplies or for such surplus power shall be at such rates as, in the Secretary's judgment, will produce revenues at least sufficient to cover the appropriate share of the annual operation and maintenance cost of the project and such fixed charges, including interest, as the Secretary deems proper. Contracts for the sale of surplus power shall be for periods not to exceed forty years and contracts for water supply for municipal or miscellaneous purposes shall be for such periods as the Secretary may determine and may include such renewal options as the Secretary deems desirable: And provided further, That in sales or leases of such power, preference shall be given to municipalities and other public corporations or agencies; and also to cooperatives and other nonprofit organizations financed in whole or in part by loans made pursuant to the Rural Electrification Act of 1936 and any amendments thereof.

“SEC. 10.

(a) In connection with any project constructed pursuant to the provisions of this Act, the Secretary shall have the same authority, with regard to the utilization of lands owned by the United States, other than lands acquired under section 5 as he has in connection with projects undertaken pursuant to the Federal reclamation laws, Act of June 17, 1902 (32 Stat. 388), and Acts amendatory thereof or supplementary thereto.

"(b) In connection with the construction or operation and maintenance of a project undertaken pursuant to the authority of this Act, the Secretary shall have with respect to construction and supply contracts, and with respect to the acquisition, exchange, and disposition of lands, interest in lands, water rights, and other property and the relocation thereof, the same authority, including authority to acquire lands and interests in land and water rights with titles and at prices satisfactory to him, which he has in connection with projects under the Federal reclamation laws.

“SEC. 11.

The Secretary of the Interior and the Secretary of Agriculture are hereby authorized to perform any and all Acts and to make such rules and regulations as may be necessary and proper for the purpose of carrying out their respective functions under this Act and for the purpose of carrying the provisions of this Act into full force and effect.

“SEC. 12.

To carry out the purposes of this Act there is hereby authorized to be appropriated, out of any money in the Treasury not otherwise appropriated (1) for the Department of the Interior such sums as may be necessary to carry out its functions under this Act, and (2) for the Department of Agriculture such sums as may be necessary to carry out its functions under this Act."

Approved, October 14, 1940.


Search | OSU Library Electronic Publishing Center

Produced by the Oklahoma State University Library
URL: http://digital.library.okstate.edu/kappler/

Comments to: lib-dig@okstate.edu

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 




The Native American Embassy Website is updated daily!
Every day, hundreds of American Indian and American Indian related laws, treaties & photos are
added from our archives numbering in the tens of thousands!
[Dividing Line Image]



       





eXTReMe Tracker

eXTReMe Tracker